Structure

This page presents the present structure of SC B2.

 

                                            Click on ''ref'' of the WG number for their scope

                                            Click on ''title'' of the WG  title for their term of reference


Chairman


Konstantin O. Papailiou

Secretary


Normand BELL


ADVISORY GROUPS
Ref Title Convener Duration
SAG B2 STRATEGIC ADVISORY GROUP Papailiou Konstantin Permanent
CAG B2 CUSTOMER ADVISORY GROUP O'LUAIN Cathal Permanent
P&TAG B2 PUBLICATIONS & TUTORIALS ADVISORY GROUP BELL Normand Permanent
AG B2.04 ELECTRICAL PERFORMANCE DOUGLASS Dale 2007 - ....
AG B2.05 TOWERS, FOUNDATIONS, INSULATORS Advisory Group DA SILVA Joao 2007 - ....
AG B2.06 MECHANICAL BEHAVIOUR OF CONDUCTORS AND FITTINGS TROPPAUER Wolfgang 2007 - ....
AG B2.07 ASSET MANAGEMENT,RELIABILITY, AVAILABILITY ROGIER Jan 2007 - ....
 
 
Working Groups - Task Forces
Ref Title Convener Dates
(Creation - Disbanding)
ADM_Meeting SCB2_ADMINISTRATIVE_MEETING KONSTANTIN PAPAILIOU 2010-2014
WG B2.21 Arc protection and diagnosis for composite string insulators SCHMUCK Frank 2007 - 2010
WGB2.22 Mechanical security of overhead lines with effective failure containment measures : design loading cases and strategies for effective anti-cascading supports McCLURE Ghyslaine 2008 - 2011
WGB2.23 Geotechnical and structural design of the foundations of HV & UHV Lines, application to the updating to the refurbishment and upgrading guide CUER Neil 2008 - 2011
WGB2.24 QUALIFICATION OF HV AND UHV OVERHEAD LINE SUPPORTS UNDER STATIC AND DYNAMIC LOADS KEMPNER Leon 2010-2012
WGB2.25 Preperatory studies on specifications for revision of IEC testing of Self Damping and conductor fatigue characteristics (new IEC Spec.), for high temperature Fittings (IEC 61284), for tests on spacers (IEC 61854) and on dampers (IEC 61897) COSMAI Umberto 2007 - 2010
JWG B2./B3.27 Live line maintenance : a management perspective LINDSEY Keith 2008 - 2011
WGB2.28 Meteorological data for assessing climatic loads. Update of IEC TR 61774 FIKKE Svein 2010-2012
WGB2.32 Assessing the performance of aged fittings: - Testing, acceptance criteria & recommendations for HV & UHV Lines. SUNKLE Dave 2007 - 2010
WGB2.34 The Impact of Line Configurations on electric and magnetic fields, radio interference and audible noise for 800 and 1100 kV OHL GALLEGO Angel 2008 - 2010
WGB2.36 Guide for Application of Direct real time monitoring systems on Overhead Transmission lines. STEPHEN Rob 2008 - 2010
WGB2.38 Evaluation of High Surge Impedance Load solutions for increased natural capacity of OHL REGIS Oswaldo 2008 - 2010
WGB2.39 Validation of Design guidelines implemented for High Intensity Wind HAWKES Henri 2008 - 2011
WGB2.40 Calculations of the electrical distances between live parts and obstacles for OHL : Preparatory studies for revision of IEC standard (IEC61865 –IEC60826 –EN50341) LAKE Robert 2008 - 2010
WGB2.41 Guide to the conversion of existing AC lines to DC operation LUNQUIST Jan 2010-2013
WGB2.42 Guide to Operation of Conventional Conductor Systems above 100°C CUSTER Len 2010-2012
WGB2.43 Guide for Thermal Rating Calculations for Overhead Lines with high temperatures and real-time weather & load data IGLESIAS Javier 2010-2012
WGB2.44 Coatings for protecting overhead power network equipment in winter conditions FARZENETH Masoud 2010-2014
WGB2.45 Bushfire characteristics and potential impacts on Overhead Line Performance VOSLOO Hein 2010-2013
WGB2.46 Wind induced motion on bundle conductors (excluding ice galloping) Diana Giorgio 2011-2014
WGB2.47 Remedial actions for aged fittings and repair of conductors Halsan Kjell 2011-2014
WGB2.48 Experience with the mechanical performance of new conductor types Wareing Brian 2011-2014
WGB2.49 Safe design tension for conductors fitted with elastomer cushioned suspension units Sunkle Dave 2011-2014
WGB2.50 Safe handling of fittings and conductors Dulhunty Peter 2011-2014
JWG C3/B2/B1.13 Environmental issues of high voltage transmission lines for rural and urban areas Lead by C3 2011-2013
WGB2.51 Methods for optimized design of overhead transmission lines STEPHEN Rob 2011-2013
WGB2.52 The use of robotic in assessment and maintenance of OHL LEBLOND André 2011-2015
WGB2.53 Management guidelines for outsourcing OHTL technical expertise LINDSEY Keith 2011-2014
WGB2.54 Management of risk assiciated with severe climatic events and climatie change on OHL HAWES Henry 2011-2014
b2image1f.jpgb2image2f.jpgb2image3f.jpgb2image4f.jpgb2image5f.jpgb2image6f.jpg
What is SC B2 ?>Technical Activities>Events>Publications>Members Area>WG Area>Links

Home

What is SC B2 ?
Scope
 
Activities
 
Membership
 
Structure
 
Official SC Documents
 
www.cigre.org