s
|
Activities
SCB2 is composed of 7 Advisory groups and 22 WG, JWG and Task Forces.
The Strategic, Customer and Publication Advisory groups have in charge to Advise SC Chairman as far as Strategy, Customer satisfaction and publications are concerned 4 Technical Advisory groups provide advice for assisting the Chairman in the definition of the directions to be followed by the SC. Their responsibilities are : 1.to coordinate WG within the scope of theTechnical AG ; 2. to identify future direction of the technology in the technical area. 3. to prepare new items of work and to submit them to CAG and SC Chairman 4. to coordinate TUTORIALS between different WG ; 5. to attract new Members and retain existing members. The list of WG is following : JTFB2/D2.18 : Overhead Lines Geographical and Asset Information System JWGB2/B4/C1.17 : Impacts of HVDC Lines on Economics of HVDC Projects JWGB2/C1.19 : Increasing Capacity of Overhead Lines - Needs and Solutions TFB2.20 : Management of risks due to load-flow capacity increases in Transmission Overhead Lines WGB2.08 : Transmission Line Structures WGB2.16 : Meteorology for overhead lines WGB2.21 : Arc protection and diagnosis for composite string insulators" WGB2.22 : Mechanical security of overhead lines with effective failure containment measures : design loading cases and strategies for effective anti-cascading supports WGB2.23 : Geotechnical and structural design of the foundations of HV & UHV Lines, application to the updating to the refurbishment and upgrading guide WGB2.25 : Preparatory studies on specifications for revision of IEC testing of Self Damping and conductor fatigue characteristics (new IEC Spec.), for high temperature Fittings (IEC 61284), for tests on spacers (IEC 61854) and on dampers (IEC 61897) WGB2.26 : A Guide to Evaluating and Accepting New Types of Overhead Conductor including those running at high temperature. JWGB2/B3.27 : Live line maintenance : a management perspective WGB2.29 : Anti- and de-icing systems for HV and UHV overhead lines WGB2.30 : Engineering Guidelines relating to fatigue endurance capability of conductor/clamp systems WGB2.31 : Modelling of Aeolian Vibration of single conductors WGB2.32 : Assessing the performance of aged fittings: - Testing, acceptance criteria & recommendations for HV & UHV Lines. WGB2.33 : Guidelines for cable cart/trolley (cycling) safety on old conductors (earthwires) equipped with aircraft warning markers (and other fittings). WGB2.34 : The Impact of Line Configurations on electric and magnetic fields, radio interference and audible noise for 800 and 1100 kV OHL WGB2.36 : Guide for Application of Direct real time monitoring systems on Overhead Transmission lines. WGB2.38 : Evaluation of High Surge Impedance Load solutions for increased natural capacity of OHL WGB2.39 : Validation of Design guidelines implemented for High Intensity Wind WGB2.40 : Calculations of the electrical distances between live parts and obstacles for OHL : Preparatory studies for revision of IEC standard (IEC61865 –IEC60826 –EN50341) |