Working groups area


SAG B2 STRATEGIC ADVISORY GROUP
CAG B2 CUSTOMER ADVISORY GROUP
P&TAG B2 PUBLICATIONS & TUTORIALS ADVISORY GROUP
AG B2.04 ELECTRICAL PERFORMANCE
AG B2.05 TOWERS, FOUNDATIONS, INSULATORS Advisory Group
AG B2.06 MECHANICAL BEHAVIOUR OF CONDUCTORS AND FITTINGS
AG B2.07 ASSET MANAGEMENT,RELIABILITY, AVAILABILITY
WG B2.16 METEOROLOGY FOR OVERHEAD LINES ( disbanded : 01/2010)
JWG B2/C1.19 INCREASING CAPACITY of OVERHEAD LINES-NEEDS AND SOLUTIONS (will be disbanded in 04/2010)
WG B2.21 Arc protection and diagnosis for composite string insulators
WGB2.22 Mechanical security of overhead lines with effective failure containment measures : design loading cases and strategies for effective anti-cascading supports
WGB2.23 Geotechnical and structural design of the foundations of HV & UHV Lines, application to the updating to the refurbishment and upgrading guide
WGB2.24 QUALIFICATION OF HV AND UHV OVERHEAD LINE SUPPORTS UNDER STATIC AND DYNAMIC LOADS
WGB2.25 Preperatory studies on specifications for revision of IEC testing of Self Damping and conductor fatigue characteristics (new IEC Spec.), for high temperature Fittings (IEC 61284), for tests on spacers (IEC 61854) and on dampers (IEC 61897)
JWG B2./B3.27 Live line maintenance : a management perspective
WGB2.28 Meteorological data for assessing climatic loads. Update of IEC TR 61774
WGB2.29 ANTI- AND DE-ICING SYSTEMS FOR OVERHEAD LINES
WGB2.30 Engineering Guidelines relating to fatigue endurance capability of conductor/clamp systems (will be disbanded in April 2010)
WGB2.31 Modelling of Aeolian Vibration of single conductors
WGB2.32 Assessing the performance of aged fittings: - Testing, acceptance criteria & recommendations for HV & UHV Lines.
WGB2.33 Guidelines for cable cart/trolley (cycling) safety on old conductors (earthwires) equipped with aircraft warning markers (and other fittings).
WGB2.34 The Impact of Line Configurations on electric and magnetic fields, radio interference and audible noise for 800 and 1100 kV OHL
WGB2.36 Guide for Application of Direct real time monitoring systems on Overhead Transmission lines.
WGB2.38 Evaluation of High Surge Impedance Load solutions for increased natural capacity of OHL
WGB2.39 Validation of Design guidelines implemented for High Intensity Wind
WGB2.40 Calculations of the electrical distances between live parts and obstacles for OHL : Preparatory studies for revision of IEC standard (IEC61865 –IEC60826 –EN50341)
WGB2.41 Guide to the conversion of existing AC lines to DC operation
WGB2.42 Guide to Operation of Conventional Conductor Systems above 100°C
WGB2.43 Guide for Thermal Rating Calculations for Overhead Lines with high temperatures and real-time weather & load data







www.cigre.org